Rack track · Closing panel
From Megawatts to Tokens: Who Operates the AI Factory
- When
- Wednesday, February 3, 20274:55 PM to 5:30 PM PT
- Where
- Room ASan Jose McEnery Convention Center
- Track
- RackDesigning the 1MW Rack. Programmed by OCP Tech Day
- Format
- Closing panel
About this session
Today the facility sees MW, cooling, temperatures and equipment health. The cluster sees GPUs, fabrics, storage and jobs. The application sees latency, tokens and outcomes. What happens when those control loops finally connect? Should they connect? Topics in scope: Should a scheduler know the marginal cost and availability of power before placing a workload? Should cooling and power systems know whether a GPU spike represents training, inference or a workload that could simply move? Can workloads move based on power availability, thermal headroom, network congestion or electricity economics? What is the common telemetry layer connecting facility to rack and token economics?
General rate, until Feb 2, 2027
Register for Digital Infrastructure World 2027
One pass covers this session and every other session, plus OCP Tech Day, the keynotes and the exhibit hall, on all three days.
- All Access$799
- Open Compute Project members$399
- Teams of 3 or more, each$599.25
More in the Rack track
- Building Interoperable AI Systems with Chiplets: Arm Neoverse and Cadence in an Open Ecosystem
- Securing the Open Chiplet Ecosystem: Defining a Common Security Architecture for FCSA
- Open Adapter Card (OAC): Sub-Rackscale Acceleration Lives On
- OCP NIC 2026: Gen 7 and Liquid Cooling, More Speed and Power Ahead